Rail noise barrier

Foundation for railway noise barrier

Foundations for railway noise barriers are available in lengths from 1.5 to 3.5 meters. These foundations are significantly stronger than our other foundation types, to meet the Swedish Transport Administration's requirements for dynamic loads and service life classes.

The design speed of the train can vary between 50 km/h to 300 km/h where the distance from the track is from 3.5 m and above. Thanks to Terrawing high capacity, our foundations are particularly favorable along the rail, since it is often limited time to work along the track. Because you knock down the foundations in unspoiled ground, you also avoid problems with possible replacements due to digging in the embankment, when the noise protections are located near the track.

If you can only access the foundations from the track, use a tracked excavator or Bopec tracked machine placed on a train carriage. If there is space next to the track, avoid using the rails by striking the foundations with an excavator or Bopec tracked machine directly from the ground.

If you Want to know more about our foundations, you are welcome to contact us at TerraWing

Please call us if you are designing or building noise barriers along a railroad. Then we can share the knowledge we have acquired from the more than 50 km of noise barriers we have had reviewed and approved by the Swedish Transport Administration/SL.

Manufacturing of foundations made in factories that meet the following requirements:

Noise protection with foundations from Terrawing

Foundation for railway noise barrier

Foundation for the foundation of noise protection by rail is available in lengths from 1.5 to 3.5 m. These foundations are significantly more powerful than our other foundation types, this is to meet the transport agency's demands for dynamic loads and life span classes.

The design speed of the train can vary between 50 km/h to 300 km/h where the distance from the track is from 3.5 m and above. Thanks to Terrawing high capacity, our foundations are particularly favorable along the rail, since it is often limited time to work along the track. Because you knock down the foundations in unspoiled ground, you also avoid problems with possible replacements due to digging in the embankment, when the noise protections are located near the track.

Noise protection with foundations from Terrawing

If there is enough space to install the foundations from the track we can use a rail-mounted excavator or Bopecs track machine placed directly on the railway carriage. If space is available next to the track we can avoid to use the track by installing the foundations with an excavator or crawler Bopec's machine directly from the terrain.

If you Want to know more about our foundations, you are welcome to contact us at TerraWing

Please call us if you are designing or building noise barriers along a railroad. Then we can share the knowledge we have acquired from the more than 20 km of noise barriers we have had reviewed and approved by the Swedish Transport Administration/SL.

Manufacturing of foundations made in factories that meet the following requirements: